How a stand is built
From drawing to opening night.
- Draw
- Engineer
- Finish
- Light
- Hand over
Your brief, the hall plan and the organiser's rules become a measured 3D drawing before anything is cut.
Structure and joinery go to the organiser for approval, then get fabricated and test-fitted in the workshop.
Floors, laminates, fabric and acrylic. You approve physical samples, so colours hold under hall lighting.
Halls are lit flat and bright. Spots, LED lines and screens give the stand its own light, visible from the end of the aisle.
Graphics go up during build-up. You walk onto a finished, cleaned stand the evening before the doors open.
Typical timeline for a 50-100 m² custom stand. The stand shown is a concept for a fictional brand, rendered live in your browser.
One size doesn't fit all. Every stand starts from your objectives, your floor space and your show.
Before we draw a line we ask what the stand has to do: launch a product, book meetings, or pull a crowd off the main aisle. The design follows from that answer.
The floor plan decides half the design.
Organisers sell space by how many sides of a stand face an aisle. That decides where walls go, where visitors walk in, and how long the build takes.
Services
One team from the workshop to the show floor.
Selected work
Trusted on the show floor since 2005.
Stands we designed and built for brands, institutions and national pavilions across the Gulf. Pick a name to see the stand.
Upcoming shows
Your next show, and when to start.
A custom stand needs about twelve weeks from brief to opening day. Pick your show to start a brief with its dates filled in.
Dates come from each organiser's published calendar and may change. Exhibiting somewhere else? Start a brief for any show.
Built in the UAE. Installed where your show is.
Stands are planned from Dubai and Abu Dhabi, then shipped, installed and taken down for clients exhibiting abroad.
Before you call
Ask the studio.
Tap a question. These are the ones every exhibitor asks before the first meeting.
Tell us about your show.
Three short steps. The badge works out when design has to start for the stand to be ready on time.
Prefer to talk it through? WhatsApp +971 55 133 3398
Team
The same team from sketch to strike.
Three teams under one roof. The people who draw your stand are the people who build it and install it.
Inside Cross Concept